Fitzroy Place, a mixed-use development in the heart of London’s West End, needed to provide energy-saving heating for its offices and residential spaces.

This impressive new complex for Exemplar, in partnership with Aviva Investors and Kaupthing hf, provides 287 private apartments in three residential blocks, as well as two new office buildings with a combined square footage of 450,000 and retail units designed around a landscaped public garden.

Remeha boilers were selected to operate alongside the central CHP plant serving the property. Contractors Dornan Engineering Ltd for Sir Robert McAlpine supplied and installed the boilers which were chosen for their quality and reliability.

Working closely with the aftersales department, the Remeha technical team produced a specially-configured sequencer control solution to meet the multiple boiler requirement. This enables each cascade to sequence independently through the Central Building Management System. 

The Gas 310/610 Eco Pro range is designed for easy connection with CHP units for maximum ease of installation and efficiency.

 

ENGINEERING EFFICIENCY SINCE 1935