24/7 Support OUT-OF-HOURS ENGINEER SUPPORT

The Gas 310/610 Eco Pro is specially designed for maximum versatility and energy efficiency. Available in five to ten sections, its compact design means it fits through any standard doorway. For restricted or awkward access, it can be disassembled into parts, reducing labour and time costs.

The Gas 310/610 Eco Pro has the capacity to be installed side-to-side which provides flexibility in floor design. It also has an optional secondary return feature that makes this boiler particularly suitable for use with heating technologies that use low grade heat, such as heat pumps or underfloor heating circuits.

  • High-efficiency boiler up to 98.4% GCV - higher than average energy savings
  • Lightweight construction and supplied fully assembled on wheels - quick and easy installation
  • Easy to disassemble - time and labour savings, particularly where access is restricted or awkward
  • Extremely compact at only 72cm wide - able to fit through a standard doorway
  • Ability to be installed side-to- side - added flexibility of plant room configuration
  • Ultra-low Class 5 NOx emission levels from 26mg/kWh (0% 02, dry) - Low pollutant emissions meeting all environmental legislation
  • Intelligent advanced boiler control with options for direct weather compensation - close matching of heat demand at all times for maximum energy efficiency
  • Digital diagnostic display and remote signalling options - easy operation and maintenance
  • Quiet operation less than 59 dBA - improved comfort

LITERATURE FOR the Gas 310/610

Download all literature and product documents for the Gas 310/610 by clicking the links below

TECHNICAL INFORMATION

Click to download the technical specification for the Quinta Ace 160 in PDF format

 

GAS 310 285/5

GAS 310 335/6

GAS 310 430/7

GAS 310 500/8

GAS 310 575/9

GAS 310 650/10

PERFORMANCE

Nominal heat output central heating operation @ 80/60°C kW (min-max)*

51-261

65-327

79-395

92-461

106-530

119-601

Nominal heat output central heating operation @ 50/30°C kW (min-max)*

279

350 425 497 574 651

Nominal input (Hi) (min-max)

54-266

68-333

82-402

95-469

109-539

122-610

EFFICIENCY

SBEM seasonal efficiency GCV

96.62%

96.64%

96.58%

96.09%

95.88%

95.75%

Efficiency – full load 100% NCV

98%

98.1%

98.2%

98.3%

98.4%

98.5%

Efficiency – part load 30% NCV

109.2%

109%

108.8%

108.6%

108.3%

108.1%

Eco design useful efficiency @ 80/60°C (100% full load) GCV

88.2%

88.3%

88.4%

N/A

N/A

N/A

Eco design useful efficiency @ 50/30°C (30% part load) GCV

98.6%

98.6%

98.5%

N/A

N/A

N/A

Energy labelling seasonal space efficiency GCV

94%

95%

94%

n/a

n/a

n/a

ErPD efficiency rating

A

A

A

n/a

n/a

n/a

Annual energy consumption kWh

91

124

187

n/a

n/a

n/a

Gas connection size BSP inches

¾” male thread

¾” male thread

¾” male thread

¾” male thread

¾” male thread

1” male thread

GAS

Standard fuel

Natural gas

Natural gas

Natural gas

Natural gas

Natural gas

Natural gas

Gas consumption NG m3/h

28.1

35.2

42.5

49.6

57

64.6

Min/max gas inlet pressure NG mbar

17-30

17-30

17-100

17-100

17-100

17-30

Gas connection size BSP inches

2" (F)

2" (F)

2" (F)

2" (F)

2" (F)

2" (F)

FLUE (CONCENTRIC CONNECTION SUPPLIED AS STANDARD)

Flue diameter mm I/D

250

250

250

250

250

250

Air inlet diameter mm I/D

250

250

250

250

250

250

Min/max flue gas flow rate kg/h

91-448

114-560

138-676

160-789

183-907

205-1026

Min/max flue gas flow rate g/s

4.1-15.1

4.1-20.7

5.9-30.1

6.5-39.5

8.0-52.8

76.9 max

Min/max flue gas temperature °C

30-80

30-80

30-80

30-80

30-80

30-80

Max counter pressure Pa

70

150

100

160

220

200

HYDRAULICS

Water content litres

49

60

71

82

93

104

Resistance @ 11°C ΔT mbar

374

364

397

364

413

435

Hydraulic resistance @ 20°C ΔT mbar

113

110

120

110

125

130

Nominal flow rate @11°C ΔT l/s

5.68

7.11

8.59

10.03

11.53

13.07

Nominal flow rate @ 20°C ΔT l/s

3.12

3.91

4.72

5.51

6.34

7.19

Minimum flow rate m3/hr

3.4

4.2

5.1

5.9

6.8

7.8

Condensate connection

Φ32mm

Φ32mm

Φ32mm

Φ32mm

Φ32mm

Φ32mm

Connection size BSP

1¼” male thread

1¼” male thread

1¼” male thread

1¼” male thread

1¼” male thread

1¼” male thread

Standard operating temperature °C **

20-90

20-90

20-90

20-90

20-90

20-90

Max operating temperature °C

90

90

90

90

90

90

Max water temperature °C

110

110

110

110

110

110

Max water operating pressure bar

7

7

7

7

7

7

Min water operating pressure bar

0.8

0.8

0.8

0.8

0.8

0.8

Min operating pressure bar

0.3 o/v

0.3 o/v

0.3 o/v

0.3 o/v

0.5 o/v

0.5 o/v

GENERAL

Dry weight kg

364

398

433

495

531

568

Dimension (WxHxD)

1862x1500x716

1862x1500x717

1862x1500x718

1862x1500x719

1862x1500x720

1862x1500x721

NOx (Dry, 0% 02) Mg/kWh

33

35

32

29

36

26

Noise levels dB(A) at 1 metre

61

61

65

65

65

65

Eco design sound power levels LWA indoors dB

69

69

69

N/A

N/A

N/A

Standby heat Loss

0.21

0.18

0.15

0.13

0.12

0.11

ELECTRICAL

Nominal power supply

230v x 1Ph x 50hz

230v x 1Ph x 50hz

230v x 1Ph x 50hz

230v x 1Ph x 50hz

230v x 1Ph x 50hz

230v x 1Ph x 50hz

Start current amps

4

4

4

4

4

4

Power consumption W

6-279

6-334

6-426

6-543

6-763

7-723

Modulating input V dc

0-10

0-10

0-10

0-10

0-10

0-10

Fuse rating amps

10

10

10

10

10

10

Controls voltage

24 (max 4va)

24 (max 4va)

24 (max 4va)

24 (max 4va)

24 (max 4va)

24 (max 4va)

Electrical protection index VAC

X1B

X1B

X1B

X1B

X1B

X1B

*Gas consumption based on lower heating value under standard heating conditions: T=288.15K, p=1013.25mbar. Gag 30.33, G25 29.25, G31 88.00 MJ/m3

**Open vented option maximum operating temperature 75°C

  • Bristol Old Vic

    Standing ovation for compact, reliable Gas 310 Eco Pros at England’s oldest theatre.

    Grade I-listed Bristol Old Vic needed to update its heating system as part of a sensitive £12million redevelopment.
  • Central Criminal COURT

    Central Criminal Court installs Remeha boilers as part of major refurbishment scheme

    The Central Criminal Court for England and Wales, known as the Old Bailey, has undertaken a major ten-year, £43million, modernisation and refurbishment plan
  • Durham Cathedral

    Durham Cathedral installs Remeha boilers in major restoration project.

    Durham Cathedral needed to update its heating system as part of a major restoration project to create a world-class visitor exhibition.
  • Fitzroy Place

    Gas 310/610 Eco Pros deliver reliable, high-quality heating at Fitzrovia’s luxury mixed-use development.

    Fitzroy Place, needed to provide energy-saving heating for its offices and residential spaces.
  • Freshfields Bruckhaus Deringer

    Magic Circle law firm benefits from energy-efficient new heating system.

    An upgrade of the heating system was essential to restore a reliable heating service
  • Fullwell Cross Leisure Centre

    The London Borough of Redbridge (LBR) has upgraded the boiler plant at Fullwell Cross Leisure Centre in Barkingside, Ilford.

    The key requirements were to ensure heating reliability, reduce maintenance costs and improve the energy efficiency of the Centre.
  • Hull Extra Care Housing

    Remeha boilers provide high efficiency heating for 316 new Extra Care apartments across Hull.

    After Hull City Council secured £80 million of Private Finance Initiative (PFI) funding
  • Institute of Civil Engineers

    ICE specifies Remeha boilers as part of refurbishment project

    The Institution of Civil Engineers (ICE) has installed Remeha high efficiency condensing boilers at its London headquarters
  • Mulberry School for Girls

    Remeha boilers provide a lesson in reliable, efficient heating at girls’ school

    When the time came to replace the existing boilers, Mulberry School chose to upgrade to Remeha boilers
  • National Library of Wales

    Remeha boilers help preserve prized collections at National Library of Wales.

    Aber Heating installed three Gas 310-500 Eco Pro boilers
  • Oldham Civic Centre

    Oldham Council improves heating efficiency with Remeha boilers

    Oldham Council has installed five Remeha boilers as part of a major refurbishment of the heating plant serving its Civic Centre complex.
  • Riverlight, South Bank

    Gas 610 Eco Pros selected for Rogers Stirk Harbour + Partners residential development.

    Riverlight is a stunning new residential development situated directly on the riverfront in Nine Elms on the South Bank.
  • Winter Gardens

    Remeha boilers selected for restoration of historic Winter Gardens Pavilion, Weston-Super-Mare

    Remeha boilers have been installed to provide efficient, reliable heating for the Weston College Group, its new owner.

You may be interested in...

ENGINEERING EFFICIENCY SINCE 1935